TfL and Fastned have opened a second ultra-rapid EV hub, at East Finchley, and a 36-bay hub at Hanger Lane is due in spring 2027. None is in Kensington yet.

Transport for London’s (TfL) charging venture with Fastned now has two ultra-rapid hubs for electric vehicles open, and the largest it has planned is being built at Hanger Lane in Ealing, on the A40 Western Avenue at the North Circular. TfL says 93 per cent of inner London households, which includes most of Kensington and Chelsea, have no private off-street parking, the gap the hubs are meant to fill.

The second hub opened earlier this month in the car park of East Finchley Underground station on High Road. The first, at Hatton Cross near Heathrow Airport on the Piccadilly line, opened in April 2026. Neither of them, and none of the five sites where building starts next year, is in the Royal Borough.

Overview

  • Open now: Hatton Cross (since April 2026) and East Finchley station car park (eight bays, opened this month).
  • Next big one: Hanger Lane, Park Royal, 36 bays, due in spring 2027.
  • Building in 2027: Dagenham Dock, Hillingdon, Hounslow East, Redbridge and West Barking, 66 bays between them.
  • Speed: 400kW chargers, up to 100 miles of range in five minutes for compatible vehicles, TfL says.
  • In Kensington and Chelsea: no site has been announced.
  • Who runs it: Fastned and Places for London, TfL’s property company, in a joint venture.

Why it matters for drivers without a driveway

The figures come from TfL’s Travel Demand Survey: 93 per cent of households in inner London and 64 per cent in outer London lack private off-street parking. The venture says its hubs are for residents, commuters, taxis, private hire vehicles and commercial fleets who cannot charge at home. For kerbside bays, permits and the borough’s own charging points, see our guide to parking in Kensington, and for the proposed rise in the borough’s parking charges from April, our report on the 2027 tariffs.

Seb Dance, Deputy Mayor for Environment and Energy, said: “To tackle the climate crisis, clean up our air, and build a net-zero city, we must make switching to electric vehicles seamless for every Londoner. The Mayor’s goal is for London to have 40,000 EV chargers by 2030 and the incredible momentum achieved by Fastned and Places for London proves what can be achieved when bold ambition meets rapid delivery.

“From Hatton Cross to East Finchley, and with monumental sites like Hanger Lane coming soon, this roll-out is vital for the thousands of drivers who don’t have access to a driveway. Together, we are hitting our stride and ensuring London remains at the global forefront of the green transport revolution as we continue to build a fairer and greener London for everyone.”

Hanger Lane: 36 bays in spring 2027

The Hanger Lane hub is going up on unused land within the Park Royal industrial estate and is set to be London’s largest ultra-rapid EV charging destination. It is due to open in spring 2027 with 36 bays under Fastned’s yellow solar canopies, plus a shop, toilets and outdoor seating. TfL says it is meant for local Park Royal businesses and fleets, families, visitors and people passing into London on the A40 Western Avenue and the A406 North Circular Road.

Fully electric cement mixers are being used on site, and the plans include better pedestrian and cycling access and new landscaping, according to TfL.

A computer-generated aerial view of a charging hub with zigzag yellow solar canopies, a parking area, picnic tables, a Fastned building and a cycle lane alongside
A computer-generated image of the planned Hanger Lane hub in Park Royal. Image: Transport for London press office

Tom Hurst, UK Country Director at Fastned, said: “We are building real momentum across London. In less than a year, we’ve proven that well-designed, ultra-rapid charging changes the game for drivers. With Hatton Cross answering a critical local demand, East Finchley now welcoming drivers, and our game-changing 36-bay Hanger Lane flagship taking shape, we’re showing what the future of urban charging looks like.

“Securing planning for key sites in Barking and Dagenham, Hillingdon and Redbridge gives us the springboard to accelerate even faster. Drivers want fast, reliable, safe charging that fits naturally into their day.”

The two hubs already open

East Finchley, in the Northern line station car park, has eight bays and took eight months from planning consent to opening, TfL says. It is the first of the venture’s sites with Fastned’s yellow solar wings.

Hatton Cross supported more than 1.1 million zero-emission kilometres in its first six months, which TfL puts at the equivalent of 28 laps of the Earth.

A Fastned sign and a Places for London sign in front of a charging hub with a yellow solar canopy, beside Hatton Cross bus station, with a yellow car driving past
The Fastned hub at Hatton Cross, the joint venture's first site. Photo: Transport for London press office

All the venture’s sites run on 100 per cent renewable energy and are designed with extra-wide bays, clear sightlines and lighting, 24/7 multilingual support and fully accessible spaces in line with British Standards Institution guidance, the release says.

The sites being built in 2027

The venture has nine planning consents and is waiting on decisions for three more. Construction is due to start next year on at least five sites with 66 bays between them, which would take the network to eight sites and 122 bays:

  • Dagenham Dock: 16 bays and a retail unit.
  • Hillingdon: 12 bays in the station car park.
  • Hounslow East: 8 bays in the station car park.
  • Redbridge: 12 bays in the station car park, just off the A406.
  • West Barking: 18 bays and a retail unit.

The partners aim to have up to 25 sites across London by 2030.

John Colgan, Electric Vehicle Charging Hubs Programme Manager at Places for London, said: “Seeing our joint venture with Fastned move at such a pace is hugely exciting. By unlocking TfL’s estate, we are transforming accessible land into critical, sustainable infrastructure where the capital needs it most. Every new bay we deliver helps decarbonise our transport network, supports local air quality, and generates revenue to be reinvested directly back into London’s transport system.”

London’s charging network in figures

  • More than 29,500 public charging devices, around a third of the UK total, including more than 2,000 rapid or ultra-rapid devices.
  • Between 860,000 and 1,049,000 electric vehicles projected on London’s roads by 2030, 29 to 36 per cent of the city’s car and van fleet.
  • Around 43,000 to 51,000 more charge points expected to be needed to meet that demand, several thousand of them 50kW or above.
  • TfL estimates that the growth in electric vehicles, with the charging to support it, could cut London’s annual carbon emissions by between 1.5 million and 2.6 million tonnes by 2030.

Source: Transport for London press office.